Mapping dependencies is the first step in migrating an interconnected application to Google Cloud without downtime. You document every communication path between services, which service talks to which and through what mechanism, and that dependency graph determines the order in which services move. Each service is then migrated, tested, and cut over to production traffic before the next one begins. Migration planning of this kind can come up on the Professional Cloud Architect exam, so both the steps and the reasons behind them are worth knowing.

Why interdependent services are hard to migrate

Consider an application built with a microservices architecture. Service A handles payment processing, service B manages user authentication, service C takes care of inventory, and service D sends out notifications. None of them work in isolation. They are constantly talking to each other through APIs and messaging systems. Payment processing needs to verify user authentication, and inventory updates trigger notifications.

Two things make moving this application to Google Cloud difficult. The first is that downtime is not acceptable. Customers expect the application to keep running normally while it is being moved to the cloud. The second is the risk of cascading failures. Because the services depend on each other, a problem in one service during the migration does not stay with that service. If the payment service cannot process transactions because the authentication service is unreachable, that is a serious problem, and the notification service breaks as well if it cannot get inventory updates. A failure in one place can trigger problems across the entire system.

Step one: map the dependencies

The answer to this problem is a systematic, stage-by-stage approach, and it starts with understanding and mapping the dependencies. Document all of the communication paths between services: who talks to whom, and through what mechanisms, such as API calls or messaging. The result is a dependency graph, and that graph is what you use to plan the migration order.

On Google Cloud, Migration Center supports this kind of discovery and planning. In its Discover phase, it can automatically scan an environment to build an inventory of assets such as VMs, databases, and applications. The assessment that follows helps identify which workloads are good candidates for migration and what dependencies exist between them. The planning phase is where the migration strategy and the order of operations are worked out, and where risks are identified, before the actual migration begins.

Step two: migrate, test, and cut over one service at a time

With the order established, each service goes through the same cycle: migrate it, test it, and cut production traffic over to it, in the sequence the dependencies determine. In the example, service D might go first, perhaps because it has the fewest dependencies on other services. It gets running in Google Cloud, it is tested thoroughly to confirm it works correctly, and then production traffic is cut over to the Google Cloud version. At that point service D is fully running in production on Google Cloud.

If the dependency graph points to service C next, C goes through the same process, and then C and D are both running in production on Google Cloud. Service A follows, migrated, tested, and cut over, and the process continues until every service has moved.

Each service completes the full cycle before the next one starts. This is not a matter of migrating everything at once and testing it all together. Each piece is validated with actual production traffic before the migration moves on to the next one.

Why the staged approach works

  • Dependencies reveal the migration order, so it is clear which services should move first.
  • Each stage is validated before the next, so issues are caught early, with real production traffic on a small subset of the system.
  • The blast radius stays limited. If a stage has problems, only that one service is affected, and it can be rolled back without impacting the services that have already been migrated successfully.

For a Professional Cloud Architect, the reasoning matters as much as the steps. The dependency graph decides the order, and completing the full migrate, test, and cut over cycle for one service before starting the next is what keeps a problem in any single stage from spreading to the rest of the system.

Our Professional Cloud Architect course covers dependency mapping for cloud migrations alongside Migration Center and migration planning, with practice questions that drill these distinctions.

Get tips and updates from GCP Study Hub

arrow